New Guyra – Ebor road open
Friday 13 May 1938, The Sydney Morning Herald
NEW GUYRA-EBOR ROAD OPEN The construction of the new Guyra-Ebor road, which connects the New England High- way at Guyra with the Armldale-Grafton road near Ebor, is now complete, with the excep- tion of two very short sections, advises the N.R.M.A. touring department. The road has been opened to traffic, but care should be exercised by drivers at creek and river cross- ings, as in most instances side tracks and temporary bridges are still in use, pending the completion of the new structures. The new road, which is about 50 miles long, pro- vides another cross country route from the tablelands to the coast, and takes the travel- ler through Aberfoyle, opening up a stretch of attractive country.
Leave a Reply